MarineListing
SOLAS Ch. V & IMO Certified Marine Service

ECDIS Service & Chart Updates

ECDIS Service & Chart Updates

10 min read Global Port & OPL Anchorage Coverage IACS Class Approved Protocols
Require Attendance or Spares for This Equipment?
Post an RFQ to reach authorized service engineers & bonded suppliers worldwide.
Dispatch RFQ Free

ECDIS Service & Chart Updates

BLUF: Class-approved ECDIS (Electronic Chart Display and Information System) service, electronic chart updates, and certification for Transas, JRC, Furuno, Wartsila, Kelvin Hughes, and other major ECDIS manufacturers. Service includes ENCs (Electronic Navigational Charts) installation and correction, ECDIS performance testing, dual ECDIS verification, backup chart arrangements, and certification compliance with SOLAS Chapter V Regulation 19, IMO MSC.232(82), IHO S-52, and IHO S-57. Full worldwide port attendance with 24-48 hour turnaround for chart updates and 72 hours for ECDIS certification.

Statutory Mandates & Class Rules

ECDIS systems are mandatory under SOLAS Chapter V for vessels engaged on international voyages based on vessel size and type. The following regulatory framework governs ECDIS service and certification:

Classification Society Survey Requirements

Class Society Survey Interval Key Documentation Required
DNV Annual inspection, intermediate survey (2.5 yrs) Class certificate, ECDIS type approval, chart update records
ABS Annual survey, intermediate survey Service record, ENC permit verification, performance test results
Lloyd's Register Annual class survey, intermediate survey Equipment log, manufacturer service bulletin compliance
ClassNK Annual inspection, intermediate survey Japanese flag additional requirements for Japanese vessels
Bureau Veritas Annual survey with Class notation BV-specific test procedures, surveyor sign-off
RINA Annual classification survey, intermediate survey Italian flag-specific requirements, ECDIS performance certificate
Indian Register of Shipping Annual survey, intermediate survey Indian Coastal Vessel Code compliance if applicable

Technical Architecture, Diagnostics & Failure Modes

ECDIS System Types & Configurations

Common ECDIS Manufacturers

ENC (Electronic Navigational Charts) & Update System

Diagnostic Parameters & Failure Modes

Critical Alarm Codes & Diagnostic Indicators

Alarm Code Description Probable Cause Required Action
CHART EXPIRED ENC chart edition expired Chart update failure, permit expiry Immediate chart update, permit renewal
PERMIT EXPIRED ENC permit expired Permit renewal failure, subscription issue Permit renewal, subscription check
DEPTH ALARM Depth alarm triggered Under keel clearance insufficient Route modification, safety contour adjustment
CROSS TRACK ERROR Vessel off planned route Navigation error, current, drift Course correction, route monitoring
SENSOR INPUT ERR Sensor input failure GPS, gyro, speed log failure Sensor troubleshooting, backup activation
SYSTEM FAIL ECDIS system failure Hardware fault, software crash System restart, backup ECDIS activation
CHART ALARM Chart-related alarm (danger area) Vessel approaching charted danger Route modification, alert bridge team
BACKUP CHART EXPIRED Backup chart arrangement expired Paper charts not updated Backup chart update, verification

Standard Operating Procedure / Service Protocol

Pre-Service Assessment

  1. Documentation Review: Verify Class survey status, ECDIS type approval certificates, ENC permits, chart update records
  2. System Inventory: Document ECDIS models, serial numbers, software versions, chart catalog subscriptions
  3. Chart Currency Check: Verify ENC edition dates, update currency, permit validity, coverage areas
  4. Operational Check: Perform functional test with vessel at berth, verify sensor integration, alarm functions
  5. Backup Verification: Verify backup chart arrangements currency, backup ECDIS functionality

ECDIS Performance Testing Procedure

  1. System Verification: Verify ECDIS type approval certificate validity, software version compliance
  2. Display Accuracy: Test display accuracy using test points, verify scale accuracy, symbol display
  3. Position Accuracy: Test position accuracy using known positions, verify GPS input accuracy
  4. Sensor Integration: Test all sensor inputs (GPS, gyro, speed log, AIS) for accuracy and integration
  5. Alarm Function Test: Test all alarm functions (depth, cross-track, grounding, chart alarms)
  6. Route Planning Test: Test route planning functions, safety contour setting, route monitoring
  7. Chart Display Test: Test chart display functions, zoom, pan, layer control, object information
  8. Backup System Test: Test backup ECDIS functionality, backup chart arrangements
  9. Documentation: Complete performance test report, update ECDIS log, obtain surveyor sign-off

ENC Installation & Update Procedure

  1. Chart Catalog Selection: Select appropriate chart catalog (AVCS, Primar, regional) based on trading areas
  2. Permit Acquisition: Acquire ENC permits via IHO S-63 scheme, verify permit validity
  3. ENC Installation: Install ENCs for vessel's trading areas, verify installation completeness
  4. Update Configuration: Configure update method (internet, email, satellite), set update schedule
  5. Update Verification: Perform initial update, verify checksums, confirm successful installation
  6. Chart Currency Check: Verify all ENCs are current edition, update expired charts
  7. Coverage Verification: Verify chart coverage for intended voyage areas, identify gaps
  8. Documentation: Complete installation report, update chart records, provide update procedures

Dual ECDIS Configuration & Backup Arrangement

  1. Dual System Verification: Verify both ECDIS systems are type-approved and functional
  2. Independence Check: Verify systems are independent (power, sensors, charts)
  3. Chart Synchronization: Ensure both systems have current ENCs and updates
  4. Sensor Redundancy: Verify sensor inputs are available to both systems independently
  5. Backup Chart Arrangement: Verify backup chart arrangements (paper charts or RCDS) are current
  6. Failover Testing: Test failover from primary to secondary ECDIS, verify continuity
  7. Documentation: Complete dual system verification report, update configuration records

Specification & Service Scope Table

Service Parameter Specification
Makers Supported Transas (Wartsila), JRC, Furuno, Wartsila, Kelvin Hughes, Sperry Marine, SAM Electronics
System Types Type-approved ECDIS, dual ECDIS configurations, integrated bridge systems
Service Standards SOLAS Chapter V Regulation 19, IMO MSC.232(82), IHO S-52, IHO S-57, IHO S-63
Chart Update Intervals Weekly updates recommended, mandatory per Flag State requirements
Test Equipment Required ECDIS test sets, GPS simulators, chart update verification tools
Average Turnaround Time 24-48 hours for chart updates; 72 hours for ECDIS performance testing
Certification Provided Class-approved service reports, ECDIS performance certificates, chart update verification
Service Validity Until next required update or Class survey
Critical Spares Stocked ENC permits, chart catalogs, system components, backup media
Personnel Qualification Class-approved ECDIS technicians, manufacturer-trained specialists, ECDIS navigators
Surveyor Coordination Full Class surveyor liaison, Flag State notification support, type approval verification

Worldwide Attendance & Port Logistics

Global Port Attendance Capability

Attendance Modes & Logistics

Logistics Protocol

  1. Chart Update Delivery: Coordination of ENC updates via internet, email, or physical media
  2. Permit Management: Coordination of ENC permit acquisition and renewal via chart agents
  3. Software Updates: Coordination of ECDIS software/firmware updates via manufacturer channels
  4. Surveyor Liaison: Pre-arrival coordination with Class surveyor, documentation preparation
  5. Work Hour Planning: 24/7 operation capability for port stays with tight schedules
  6. Training Support: ECDIS operator training, update procedure training, troubleshooting guidance

Global Query Fan-Out / FAQ

Q1: What is the difference between ENC (vector charts) and RNC (raster charts), and which are required for ECDIS?

A: ENC (Electronic Navigational Charts) are vector charts where chart objects are stored as digital data that can be manipulated, queried, and displayed at different scales. RNC (Raster Navigational Charts) are scanned paper charts displayed as images without object-level data. SOLAS requires ECDIS to use ENC (vector charts) as the primary chart format. RNC can be used in RCDS (Raster Chart Display System) mode or as backup, but ENC is required for full ECDIS functionality. We provide both ENC and RNC services, with emphasis on ENC compliance for ECDIS operations.

Q2: How often do ENCs need updating, and what happens if updates are missed?

A: ENCs should be updated weekly per IHO recommendations and Flag State requirements. Missed updates can result in expired charts, potentially creating navigation safety hazards and regulatory non-compliance. ECDIS systems provide alerts for expired charts. If updates are missed, immediate action is required to update charts before voyage departure. We provide automated update scheduling, monitoring services, and emergency update assistance to ensure chart currency and regulatory compliance.

Q3: What are the requirements for dual ECDIS configuration and backup chart arrangements?

A: Dual ECDIS configuration requires two independent type-approved ECDIS systems with independent power supplies, sensor inputs, and chart data. Backup chart arrangements require either paper charts or RCDS (Raster Chart Display System) covering the vessel's trading areas. Both systems must have current charts and be operational. The backup arrangement must be maintained and ready for immediate use if primary ECDIS fails. We provide dual system verification, backup chart management, and failover testing to ensure compliance with SOLAS and Flag State requirements.

Q4: How does ECDIS service integrate with other bridge navigation systems?

A: ECDIS service includes verification of integration with other bridge systems: GPS/GNSS for position input, gyro compass for heading, speed log for speed input, AIS for target overlay, radar for radar overlay (ARPA), and conning displays. Technicians test NMEA 0183/IEC 61162-1 interfaces, verify data accuracy, test sensor redundancy, and ensure proper integration per IMO performance standards. We also test alarm integration between ECDIS and other bridge systems for comprehensive safety.

Q5: What is the procedure for ENC permit acquisition and IHO S-63 compliance?

A: ENC permit acquisition involves: (1) Selecting chart catalog (AVCS, Primar, regional), (2) Applying for permits through authorized agents, (3) Installing permit keys in ECDIS via IHO S-63 data protection scheme, (4) Verifying permit validity and coverage, (5) Setting up automatic permit renewal. IHO S-63 ensures data protection and prevents unauthorized use of ENCs. We provide complete permit management services including acquisition, installation, renewal, and troubleshooting.

Q6: Can ECDIS service be performed during voyage, and how are chart updates handled remotely?

A: ECDIS service can be performed during voyage via remote support using satellite communication. Chart updates can be downloaded and installed remotely, system diagnostics can be performed, and troubleshooting assistance can be provided. However, physical hardware repairs, complete system overhauls, and some software updates may require port attendance. We provide 24/7 remote ECDIS support, satellite-based update delivery, and remote diagnostics to minimize voyage disruptions while ensuring chart currency and system functionality.

214 Countries • 5,588+ Ports & OPL Zones

Schedule Equipment Service or Request Spares

Submit your vessel IMO, attendance port, and maker model. Reach IACS-certified service stations with genuine maker spares and bonded logistics in under 60 minutes.